SOLUTION SETS
NEWSLETTERS
LOGIN
Follow us on
Upload your Case Studies
JOIN CONTENTREE
SIGN UP
Vendors
Chemco International Ltd
Chemco International Ltd
Chemco International Ltd
132 Solutions
Do you work for
Chemco International Ltd ?
Contact us to update this profile
All information is currently provided by Contentree
Chemco International Ltd
0 Solution Set
Search
Solutions
Case Study
OverviewA fleet of tugboats stationed in the Port of Antwerp…
Case Study
The sewage tank on-board an offshore supply ship was suffering…
Case Study
The swimming pool on-board a large cruise ship was suffering…
Case Study
The exposed steel piles underneath a jetty required a corrosion…
Case Study
The original coating of water ballast tanks onboard the crude…
Case Study
During revision works at a power station, a water cooler was…
Case Study
The FRP lining of the concrete sump within an FGDS absorber…
Case Study
Food Processing Manufacturer - stainless steel effluent tank…
Case Study
Cruise Ship - replace the existing coating systems in the…
Case Study
This Oil Products Tanker New Build, required to have the double…
Case Study
Chemical/oil carrier, built in 2011 and operated by Bernard…
Case Study
A hot well tank on-board the Passenger Ship required a…
Case Study
The deck steam pipes onboard the Crude Oil Tanker were suffering…
Case Study
The swimming pools on-board the cruise vessel had to be…
Case Study
Container Ship - 29 hatch covers required to be completely…
Case Study
The funnel onboard the Exhibition Vessel was suffering from…
Case Study
The Royal Navy required an environmentally friendly coating for…
Case Study
Norbulk Shipping, required a coating with a fast turnaround for…
Case Study
A Chemical Tanker had a requirement for cargo tank refurbishment…
Case Study
P&O Cruise Lines had already carried out a small trial using…
Case Study
The original coating located in the chemical cargo tanks onboard…
Case Study
The ballast tanks onboard the Self Discharging Bulk Carrier had…
Case Study
The topside tanks onboard the Bulk Carrier had previously…
Case Study
The chemical cargo tanks onboard the chemical tanker were…
Case Study
Ore Carrier - One of the cargo holds required to have 10-15%…
Case Study
The tank tops found inside four cargo tanks (3 Port, 4 Port, 4…
Case Study
The cargo tanks onboard the Oil Products Tanker required a full…
Case Study
The container ship had a requirement for a ballast tank upgrade…
Case Study
The sea water ballast tanks on board the Crude Oil Tanker…
Case Study
The ballast tanks on-board the Crude Oil Tanker were showing…
Case Study
The aluminium void tanks onboard Bourbon Offshore Asia’s Surfer…
Case Study
The aggressive nature of the caustic chemicals held within four…
Case Study
A natural gas processing plant was looking for a coating…
Case Study
The roofs of two tanks were suffering from corrosion damage and…
Case Study
Crude oil tank (75m diameter) internal lining required to be…
Case Study
The previous concrete bund had been severely eroded by the…
Case Study
Seawater had penetrated the structure completely, with water…
Case Study
A New Build bridge required a protective coating system which…
Case Study
The deck steam pipes onboard a crude oil tanker required to be…
Case Study
Ten potable water tanks on Support Station 3 required to be…
Case Study
A number of large pumps had to be refurbished, most of which are…
Case Study
One of the world’s largest cruise liner companies required to…
Case Study
The exposed steel piles underneath the main jetty required a…
Case Study
Cruise Ship - Nine of the scrubber tank’s sulphur fuel discharge…
Case Study
Transocean required to refurbish ballast tanks (over 12,000m²)…
Case Study
38 aluminium tanks on-board a hovercraft, with the majority…
Case Study
The internal surface of the kort nozzle of the MV Arco Arun was…
Case Study
A waste oil tank onboard a cruise vessel had to be refurbished…
Case Study
Norbulk Shipping, required a cost effective system to…
Case Study
Euroships required an anti-corrosion, abrasion and erosion…
Case Study
A sewage tank on-board a luxury superyacht had to be refurbished…
Case Study
Cruise Ship - The grey water tanks onboard a grand class cruise…
Case Study
The decks onboard a crude oil tanker were heavily corroded and…
Case Study
Norbulk Shipping, required their vessel ‘Amanda C’ to have its…
Case Study
The fore peak ballast tank of a towage vessel required to be…
Case Study
A chemical carrier - the tank top areas of their chemical tanks,…
Case Study
The ballast tanks of the vessel M/V AUXIS required a full…
Case Study
Thirteen ballast tanks inside the Romulus barge required to be…
Case Study
An 80 year old accommodation barge SH037 had a requirement for…
Case Study
Two crude oil tankers required to have their ballast tanks…
Case Study
The MISC FPSO required her ballast tanks to be coated in order…
Case Study
Crude Oil Tanker : Ballast Tank Refurbishment
Case Study
The Canary Wharf pier located in central London required to have…
Case Study
Barge had to undertake a major overhaul of steel replacement and…
Case Study
A fleet of bulk carriers which require fast re-fitting program…
Case Study
A tiled sulphuric acid bund area had to be over-coated with a…
Case Study
The balconies onboard a cruise vessel were suffering from…
Case Study
Turbine Hall Refurbishment
Case Study
Peterhead Power Station - internal/external protection of a…
Case Study
After many years of utilising other ceramic systems, KDHC…
Case Study
The internal surface of the water intake pipelines (over 770m),…
Case Study
Scottish Power - The 35 year old spiral casing required to be…
Case Study
Rugeley Power Station required a large fire-mains water tank to…
Case Study
High temperature ducting located at the Longannet Power Station…
Case Study
The continuously sweating pipes on the Mexilhão Platform were…
Case Study
Two pre-load tanks on Seadrill’s West Defender platform required…
Case Study
Electricity Pylons - Scottish Power sought to replace the…
Case Study
Loch side crane at Invergarry Hydro Station was to be…
Case Study
An overhead crane at a power station on the South Coast of the…
Case Study
The vent to flare pipelines onboard the offshore platform were…
Case Study
The platform legs of the Bekok B Platform were suffering from…
Case Study
An offshore platform was dissatisfied with the performance of…
Case Study
Chemco Speciality Coatings in Singapore refurbished the West…
Case Study
Heavily corroded steel pipes and flanges required a corrosion…
Case Study
Corroded meter skid consisting of 16" sweating pipeline and…
Case Study
The offshore Oil Platform required the flare stack to be…
Case Study
The internals of two small ballast tanks in a very difficult…
Case Study
A large process vessel, operational temperature at around 55ºC,…
Case Study
The decks onboard an offshore jack-up rig were suffering from…
Case Study
The ballast, diesel fuel and potable water tanks on an offshore…
Case Study
The large external doors of the heli-deck administration…
Case Study
A number of floating tank roofs at BP Kinneil, Finnart and…
Case Study
The Multinational Chemical Company had corrosion issues with…
Case Study
The bund area for a Sodium Hydroxide (5%) line is continuously…
Case Study
Dubai Electricity and Water Co. - 4,000m² of pipeline had to be…
Case Study
The internal floor area and 2m up the walls of a large diameter…
Case Study
The main criteria of this project was to reinstate a 20 year old…
Case Study
A cooling water tank was badly corroded with many areas of heavy…
Case Study
Talisman Energy - Large number of pipe work with external…
Case Study
One of Niugini Oil Company’s galvanised zinc coated sectional…
Case Study
A chemical storage tank at a waste handling facility was showing…
Case Study
Stainless steel chemical storage tanks used to store various…
Case Study
The client wanted their cooling water pump to be re-coated to…
Case Study
The internal floor area and 1m up the walls of a 44m diameter…
Case Study
A sea water process pump had a heavily corroded bronze impeller…
Case Study
Newly built Milking Parlour and building required protective…
Case Study
Edrington Distillery - required a seamless coating system to…
Case Study
Cheese Manufacturing Plant - The existing masonry production…
Case Study
The main food production floor area of 400m²required complete…
Case Study
Carbon steel mixers in a fish farm had to be coated with a…
Case Study
Composite Manufacturer - The secondary containment bund was…
Case Study
Diageo Distillery - The fermentation room required a suitable…