Two crude oil tankers required to have their ballast tanks refurbished.

Two crude oil tankers required to have their ballast tanks refurbished.

Overview Two crude oil tankers required to have their ballast tanks refurbished. The vessel owner’s were looking for a solution which could be utilised whilst the vessel was at sea by a riding squad; thus saving substantial time and cost by eliminating the requirement of dry-docking. Challenge There could be no disruption to vessel operations; therefore grit blasting and the use of solvent-based paints were prohibited. The only solution available would be to utilise water jetting and Chemco’s wet & rust tolerant coating system. Solution Water jetting was utilised as the surface preparation method. One stripe coat and primer coat of solvent- free, wet & rust tolerant epoxy Epo-chemTM RS 500P was then applied. This was followed by one topcoat of solvent-free,