Case Study

The container ship had a requirement for a ballast tank upgrade for over 30,000m2.

The container ship had a requirement for a ballast tank upgrade for over 30,000m2.

Overview The container ship had a requirement for a ballast tank upgrade for over 30,000m 2 . Chemco’s technical manager carried out a pre-dock survey whilst the vessel was at quayside in Gran Canaria. The owners made the decision to utilise Chemco solvent-free systems for the vessel’s imminent dry-docking in Turkey. Challenge Further to discussions with the owners and dockyard personnel, the decision was made to utilise fresh water pressure jet washing @ 800bar to a required WJ3 preparation standard. This method was adopted instead of dry grit blasting in order that as much work as possible could be carried out at the quayside and thus reducing the dry-docking time as well as major cost reduction by eliminating the dry grit-blasting in compliance with IMO and