SOLUTION SETS
NEWSLETTERS
LOGIN
Follow us on
Upload your Case Studies
JOIN CONTENTREE
SIGN UP
Vendors
Sparrows Group
Sparrows Group
Sparrows Group
35 Solutions
Do you work for
Sparrows Group ?
Contact us to update this profile
All information is currently provided by Contentree
Sparrows Group
0 Solution Set
Search
Solutions
Case Study
Vessel Crane Control System Upgrade
Case Study
Supply of New Build 650T Capacity Auxillary Reel
Case Study
Service and Inspection of Mooring Winch Hydraulic System
Case Study
Wire Rope Life Extension Analysis
Case Study
Wire Rope Inspection and Spooling Services
Case Study
Platform Crane Late Life
Case Study
Replacement of Draw Works Brake Cooling Unit
Case Study
Phased Array Ultrasonics PAUT Inspection of Crane Motor…
Case Study
RasGas Crane Boom Replacement
Case Study
Refurbishment of 2 Off PCM 120AS Cranes
Case Study
Motor Operated Valve Change Out
Case Study
Mechanical Handling for Gas Cooler Unit Replacement
Case Study
Inspection and Refurbishment of MLT 350SS Crane Boom
Case Study
Marine Crane Troubleshooting and Repair
Case Study
Hydraulic Pipework Pressure Testing and Flushing
Case Study
Knuckle Boom Crane Slew Gearbox Sleeve Repair
Case Study
Hydralift Crane Slew Bearing Change Out
Case Study
Glen Lyon Hook-Up and Commissioning
Case Study
Flare Tip Platform Grating Change Out
Case Study
ECR SL20-50 Stiff Leg Crane Rental
Case Study
Flushing of Fire Pump Hydraulic Drive System
Case Study
Export Hose Change Out
Case Study
Design and Delivery of Diver Workstation
Case Study
Crane Life Extension Project
Case Study
Crane Davit Arm Changeout with Spider Crane
Case Study
Crane 5 yearly SPS and Upgrades
Case Study
Crane 5-year SPS and Additional Workscopes
Case Study
Crane Fleet Late Life
Case Study
Crane Control Circuit Replacement
Case Study
Clair Ridge Lifting Support During Hook-Up
Case Study
150Te Knuckle Boom Crane Maintenance
Case Study
3D Crane Boom Survey and Structural Integrity Analysis
Case Study
Caisson Video Inspection and Simultaneous Cleaning System
Case Study
Base Inspection Services
Case Study
Fixed Platform Project: 6-monthly LOLER Survey