Case Study

Fixed Platform Project: 6-monthly LOLER Survey

Fixed Platform Project: 6-monthly LOLER Survey

CASE STUDY Challenge/objectives We were contracted by our customer to carry out a six monthly lifting equipment survey on board their platform. The lifting equipment survey was carried out in accordance with the Lifting Operations and Lifting Equipment Regulations 1998 SI No 2307 (L.O.L.E.R) and the Provisions and Use of Work Equipment Regulations 1998 SI No 2306 (P .U.W.E.R). Failures in lifting equipment can result in significant or

Join for free to read