Case Study
Glen Lyon Hook-Up and Commissioning
CASE STUDY Challenge/objectives BP required support with all of their lifting engineering services throughout the hook-up and commissioning of the Glen Lyon FPSO. As a long term specialist contractor for BP we were asked to become actively engaged in the Glen Lyon project from an early stage. Solution applied • We supported maintenance and inspection of lifting equipment as well as supplying a number of key personnel. • Baseline survey