Case Study
Base Inspection Services
CASE STUDY Challenge/objectives TCO’s Tengiz plant, which consists of five oil and gas processing trains, employs a large number of vendors on site. With each vendor utilising their own heavy equipment and lifting gear, a large variance of equipment exits on site. To safeguard the reliability of this equipment TCO required a dedicated inspection team to undertake the task of ensuring that all TCO and vendor equipment is inspected in ac