Case Study

Crane 5-year SPS and Additional Workscopes

Crane 5-year SPS and Additional Workscopes

CASE STUDY Challenge/objectives Our customer asked us to undertake a variety of work scopes on three drilling rigs due to a requirement to complete reclassification to ABS standards. With minimal downtime a priority these scopes of work had to be completed under challenging conditions across several locations. The first of three rigs needed a 5-year crane SPS (Special Periodical Survey) in 2013 in an Esbjerg shipyard with another rig re

Join for free to read