Case Study

Crane Life Extension Project

Crane Life Extension Project

CASE STUDY Challenge/objectives Our client requested our support to assess various platform crane options to see if an extension of 15-20 years beyond their original 25-year design life was recommended or whether a replacement would be required. As their preferred contractor we had previously replaced the heaviest used cranes on their platforms with latest generation models. The options required to be assessed without compromising the i

Join for free to read