Vessel Crane Control System Upgrade

Vessel Crane Control System Upgrade

CASE STUDY Challenge/objectives Obsolete controls systems reduce adaptability and are often not supported by original equipment manufacturers (OEM’s) in the event of a failure. To mitigate the risk of this and to ensure their deck crane on the vessel had sufficient capacity to programme additional steps required to de-rate it, our client appointed the Sparrows Group to upgrade their crane’s control system. Solution applied By supplying a