International Engineering Company Triumphs with Accurate Estimation

International Engineering Company Triumphs with Accurate Estimation

Pages 1 Pages

International Engineering Company Triumphs with Accurate Estimation TruePlanning’s Ease of Use Enables Rapid Response to Request For Proposal Challenge: An International engineering and manufacturing company was asked to submit a bid to NASA for the design and manufacture of a new space instrument. However, their standard bottoms up estimating method typically took four to six months to obtain a viable ballpark figure. To expedite the bid, NASA suggested that the company perform a proof of concept trial of TruePlanning from PRICE Systems. Solution: To prepare for the government bid, PRICE consultants calibrated the TruePlanning for Hardware model, transforming the inputs to reflect the analogous system requirements specified by NASA. Surprised by its ease-of-use, the project estimator be