Case Study

Silwood Depot Sidings

Silwood Depot Sidings

Pages 1 Pages

P od-Trak undertook a challenging role in this project to deliver a civils package with large programme and logistical constraints. An ever-changing P-Way design required tactical installation of the ensuing civils element of the project, with very little re-work or re-visits required by our team. The walkways consisted of reinforced concrete with ducting and sleeves installed for the lighting columns. Along side the walkways a concrete cable trough was laid for cable management. The great dedication from our workforce also contributed to Pod-Trak gaining additional scope by being awarded a contract to provide ETE support to complement Cleshar’s electrification works in the sidings “Provision of new driver walkways with lighting across the new sidings with support f

Join for free to read