New Cross Gate LOCIP Depot

New Cross Gate LOCIP Depot

Pages 1 Pages

T he scope of this project included minor civils, P-Way, ETE (third rail) and OLE to enable re-modelling of the existing depot layout including the supply of safety critical staff for the project. Civil Engineering: Driver walkways, OLE bases, cable management routes & temporary hop-ups. Permanent Way: Relocation of buffer stops and stripping out existing track to allow service diversions. Extension of the wheel lathe and heavy cleaning building, including installation of a new bogey turntable. The scope also included the installation of 28nr IBJ’s to accommodate the signalling upgrade and a new CV40 turnout. Slab track was installed within the maintenance shed and outside Electrification: To facilitate the Permanent Way and Civils scope,modifications were required to