Case Study
TGW Electrification
A s part of the overall Great Western Electrification project from London to Cardiff, this scheme covered the area between Bristol Parkway and Cardiff at a distance of 77km. Continuing the strong relationship with Balfour Beatty on electrification projects, Pod-Trak were engaged as a key supplier to provide skilled teams to work on SPS installation, wiring and final registration. This was backed up by the provision of Construction Management, Engineering Support, POS Planning, Lift Planning, POS and Plant. The Pod-Trak teams moved through sections of the project to carry out final registration and ensure the new OLE was ready for entry into service. All assurance paperwork was completed and submitted to the client for each location. Works were delivered over a series