Case Study
Reinstating Well Integrity With The Anchored Production Straddle
Serving Every Well Challenge The well was completed as a primary sand column oil producer but experienced extensive corrosion and suffered from complex well integrity challenges. Initial attempts to restore well integrity were not successful, primarily due to the reduced tubing drift. Wellbore modelling revealed severely buckled tubing above the required straddle setting depth. The operator required a slim straddle design which was capable o