Case Study

Avoiding Recompletion With A PBR Straddle

Avoiding Recompletion With A PBR Straddle

Pages 1 Pages

Serving Every Well Challenge Originally an oil producer, the client’s well had been converted to a gas injector but after a short time, they discovered a leaking completion polished bore receptacle (PBR). Region/Field: Key Capabilities: • The PBR Straddle provides required stroke length where movement is expected in the production tubing • Ability to set one straddle in tubing of different IDs • Ability to recover PBR without having

Join for free to read