Serving Every Well Challenge The client’s subsea well had been shut-in for some time due to a tubing leak to the annulus. Using extensive diagnostics, the leak was determined to be at the Production Seal / Production Seal Bore interface. The challenge presented to Interwell was to isolate and seal-off the leak, while providing for production tubing movement during the life of the well. Region/Field: Key Capabilities: • The PBR Straddle pr