Case Study
APS for Gas Lift
Serving Every Well Case Study: APS for Gas Lift Challenge Premier Oil’s Brenda D3 well is a subsea well, located in the North Sea. Three gas- lift mandrels were installed in the well and the lower two valves were deemed to be too deep, meaning the well was lifting from the top valve only. A blockage or failure occurred in the top valve and production ceased. Region/Field: Key Capabilities: • V0 tested to 5,000psi and temperatures up to 150°