Case Study
Potential saving between manufacturing and retail
Project Summary A leading European multinational pallet pooling system started up work groups between manufacturers and retailers to explore opportunities for a joint optimization of the extended supply chain. The company contracted Miebach Consulting in order that, within a work group made up of various companies there could be a determination of the material flows, costs and operational models that would allow for an optimization of the overall supply chain. Project Scope Determination and analysis of 5 "route- to-market" strategies Simulation of strategies, using a costs tool, based on the activity Validation results, based on the actual costs of participating companies Benefits Verified immense potentials that exists in collaborative solution Identified cost savings up to 40% of total