Case Study
Multi-run APS
Serving Every Well Case Study: Multi-run APS Challenge A client’s well in Vietnam required a water shut-off operation, and after experiencing problems with another service company, approached Interwell for a solution to the challenge. Region/Field: Key Capabilities: • V0 tested to 5,000psi and temperatures up to 150°C • Slim design (small OD/ large ID) • Retrieve with standard GS in a single operation • Can be run as a single or mult