Ramsågsgatan 8, SE-385 34 Torsås, Sweden • +46 (0)486 456 50 • info@pst.se • www.pst.se PST CASE STUDY LESS HOUSEKEEPING = BETTER ECONOMY Derome is a producer with a full wholesale portfolio of wooden products. At their mill in Swedish Halland they had a problem with constant leaking and time consuming cleaning around their transport conveyors. After signing a contract with PST – the problem was solved. PST delivered 32 m of maintenance free conveyors; some of which were installed “sub-floor”. Since the start of our collabo- ration – PST has installed more conveyors; and helped improve Derome’s production capacity even further. Project Optimize the material flow/reduce maintenance costs Location Veddinge, Sweden Equipment Supplied PST U-550/700,V-550/700 and V8-550/700