Case Study

FINES FROM PRE-TREATED DEMOLITION WASTE TO SILO

FINES FROM PRE-TREATED DEMOLITION WASTE TO SILO

Pages 1 Pages

Ramsågsgatan 8, SE-385 34 Torsås, Sweden • +46 (0)486 456 50 • info@pst.se • www.pst.se PST CASE STUDY FINES FROM PRE-TREATED DEMOLITION WASTE TO SILO The 80 meter conveying system deliv- ered by PST transports fine residues from commercial, and industrial waste. The material includes sand, pebbles, plastic, and wood which is conveyed to a storage silo. The system includes 4 different conveyors of type U-550, where of the 29 meter one is the longest. By using encapsulated conveyors, our Finnish client can utilize the advantages of less spillage, less manpower and less maintenance costs. Project Medium distance transport of production waste Location Lahti, Finland Equipment 4x U-550 Spiral Conveyors; 3,5-29 m long Material Fines from industrial waste Capacity ~ 20 m3/h C

Join for free to read