Case Study
Industrial CHP Case Study
Industrial CHP Case Study THE OPPORTUNITY IPG Photonics Headquarters is located in Oxford, MA and has been a Top 5 Growth Company in Massachusetts for the last decade. The campus has significant electric consumption and chilled water process requirements for their production line. These processrequirementsresult inhigh energycostsand IPG Ph oto n ic ’ s facilities engineering department were evaluating energy saving options for their existing facilities and future expansionplans. After evaluating all options, the best candidate technology for their facility was a phased build-out with Tri-Generation Systemstargetedatspecificbuildingsandprocesslines. The first sizing analysis indicated a 250 kWe natural gas Tri- Gen system would be the best candidate for this site. However, aggressive expan