HM Dunn Aerospace exceeded their 20 percent targeted cycle time reduction goal

HM Dunn Aerospace exceeded their 20 percent targeted cycle time reduction goal

SEE MORE. KNOW MORE. www.thirdwavesys.com HM DUNN AEROSPACE Using Third Wave Production Module 3D, HM Dunn Aerospace exceeded their 20 percent targeted cycle time reduction goal. As an F-35 supplier, HM Dunn Aerospace manufactures components, assemblies and structures for fixed wing and rotary aircraft. Challenge: Reduce the machining time of an airframe bracket pocket component. Approach: Utilize Production Module to optimize airframe bracket pocket component machining; perform cutting demonstrations to validate simuation results. Software: Production Module 3D Results: » Maintained or improved tool life through force spike elimination » First cutting trial yielded a correct part » Reduced operator input on production parts » 25% cycle time reduction