Case Study

Consumer Electronics Leader Ensures Reliability of High- Criticality Data Center Using No Backup Generators

Consumer Electronics Leader Ensures Reliability of High- Criticality Data Center Using No Backup Generators

Pages 3 Pages

A leading consumer electronics company partnered with Vertiv’s E+I Engineering to ensure uptime at its European data center without using backup generators. Powered by renewable energy and located next to the country’s largest substation, the facility uses E+I’s Power Distribution and Control System (PDCS) and Electrical Power Management System (EPMS). These tools enable real-time monitoring, automated fault recovery, and self-healing power distribution. Results include zero downtime since deployment, reduced energy use and emissions, predictive insights into network behavior, and scalable dashboards for proactive operations and efficiency.

Join for free to read