Case Study

Clarendon Drive

Clarendon Drive

Pages 1 Pages

KKB GROUP INNOVATIVE REGENERATION SERVICES Remediation Recycling Plant Hire Plant Sales Demolition Civil Engineering The Clarendon Drive site in Medway was purchased by KKB Group in early 2011 with a view to re-developing it into a residential properties. The site was formerly used as an allotment area. The initial phase of works was to carry out site investigation work including desk study and intrusive site investigation. The investigation works highlighted the problem of asbestos and heavy metal contamination within the sites underlying soils. In this case the site constraints and excess soil levels meant these soils had to be removed from site to licensed waste disposal facility. The site was then validated to ensure its environmental compliance with planning conditions. Th

Join for free to read