Case Study

Preparation of the site for a future housing development. This required the levelling, profiling and compaction of over 38,000m3 of material.

Preparation of the site for a future housing development. This required the levelling, profiling and compaction of over 38,000m3 of material.

Pages 1 Pages

KKB GROUP INNOVATIVE REGENERATION SERVICES Client: Barkemp Construction Location: Rocky Lane Haywards Heath Value: £105,000 Start: July 2016 Completed: August 2016 For more information on KKB services, please contact us at: KKB Group Head Office, Alpha House Laser Quay Culpeper Close, Medway City Estate, Rochester, Kent, ME2 4HU Tel: +44 (0) 1634 717712 | Email: enquiries@kkbgroup.co.uk www.kkbgroup.co.uk Case Study Rocky Lane, Haywards Heath Phase 2 Earthworks Profiling The works initially involved the stripping of all topsoil from the site and retaining the material for future use. This was followed by the levelling and preparation of the site for the commencement of construction. The site was profiled and levelled using a GPS levelling system. At all stages of the profiling

Join for free to read