Case Study

The performance of RAPID BOIL™ was trialled by NHS Property Services at Monkseaton Medical Centre.

The performance of RAPID BOIL™ was trialled by NHS Property Services at Monkseaton Medical Centre.

CASE STUDY: MONKSEATON MEDICAL CENTRE (NEWCASTLE) Report No: ETMONKS Approved by: B McMullen (CEng. MIChemE) Tom VanZeeland | Chief Technology Officer Raise Energy Solutions, LLC, 1059 Triad Court, Suite 1, Marietta, GA 30062 USA 678-331-5548 ext 104 | 919-349-8199 cell | tom@raiseenergysolutions.comRAPID BOILTM Case Study: MONKSEATON MEDICAL CENTRE (NEWCASTLE) 1 CASE STUDY: MONKSEATON MEDICAL CENTRE (NEWCASTLE) INTRODUCTION: The performance of RAPID BOILTM was trialled by NHS Property Services at Monkseaton Medical Centre. Monkseaton Medical Centre is a purpose built medical centre in Whitley Bay, Tyne and Wear. The centre, which serves an area of up to 9000 residents is used by 10 full time staff. The centre is served by a Broag Remeha Quinta 60kW boiler (heating only)

Join for free to read