Case Study

The performance of RAPID BOIL™ was trialled at in the Sports Centre of an independent school in Cambridge.

The performance of RAPID BOIL™ was trialled at in the Sports Centre of an independent school in Cambridge.

CASE STUDY: INDEPENDENT SCHOOL (CAMBRIDGE) Report No: ETINDP S Approved by: B McMullen (CEng. MIChemE) Tom VanZeeland | Chief Technology Officer Raise Energy Solutions, LLC, 1059 Triad Court, Suite 1, Marietta, GA 30062 USA 678-331-5548 ext 104 | 919-349-8199 cell | tom@raiseenergysolutions.comRAPID BOILTM Case Study: INDEPENDENT SCHOOL (CAMBRIDGE) 1 CASE STUDY: INDEPENDENT SCHOOL (CAMBRIDGE) INTRODUCTION: The performance of RAPID BOILTM was trialled at in the Sports Centre of an independent school in Cambridge. Established in 1875, the school is the only co-educational boarding and day school in Cambridge. The large sports complex has a superb range of facilities available to both school pupils and the wider public it has a number of halls for Badminton, a 5-side footbal

Join for free to read