Case Study
The performance of RAPID BOIL™ was trialled by EMCOR UK at Lingley Mere, Warrington.
Case Study - Linley Mere, Warrington EMCOR UK United Utilities 1 RAPID BOILTM www.RaiseEnergySolutions.com | info@RaiseEnergySolutions.com | 678.331.5548 | 1059 Triad Ct., Suite 1, Marietta, GA 30062 The performance of RAPID BOILTM was trialled by EMCOR UK at Lingley Mere, Warrington. The 100 acre site was originally developed to be the Head Quarters of water company United Utilities. Since its launch the site has grown with new office space developments which are leased by a number of local and national businesses. The site is managed by FM provider EMCOR UK. RAPID BOILTM was trialled in United Utilities main offices, Haweswater, Ullswater, Windermere as well as smaller buildings of Clearwater 2, Clearwater 4, and the Security Office. Installs began in March 2016 but trial len