Case Study
The performance of RAPID BOIL™ was trialled at West Craven Sports Centre in Barnoldswick
CASE STUDY: WEST CRAVEN SPORTS CENTRE Report No: ETWEST Approved by: B McMullen (CEng. MIChemE) Tom VanZeeland | Chief Technology Officer Raise Energy Solutions, LLC, 1059 Triad Court, Suite 1, Marietta, GA 30062 USA 678-331-5548 ext 104 | 919-349-8199 cell | tom@raiseenergysolutions.comRAPID BOILTM Case Study: WEST CRAVEN SPORTS CENTRE 1 CASE STUDY: WEST CRAVEN SPORTS CENTRE INTRODUCTION: The performance of RAPID BOILTM was trialled at West Craven Sports Centre in Barnoldswick on behalf of Pendle Leisure Trust and Pendle Borough Council. West Craven Sports Centre is a multi-use sports complex with an 25m indoor heated swimming pool. The swimming pool is powered by 2*347 kW boilers and the rest of the centre is powered by 6*105kW boilers (assume 2 on standby). A total of