Case Study
Shaya Project Saves USD 2.5 Million on Workovers by Eliminating ESP Changes in a Mature Field, Ecuador
Shaya Project Saves USD 2.5 Million on Workovers by Eliminating ESP Changes in a Mature Field, Ecuador
Case study: Artificial Lift Location: Ecuador Shaya Project Saves USD 2.5 Million on Workovers by Eliminating ESP Changes in a Mature Field, Ecuador REDA Continuum pumps manage gassy and sandy wells with steep production declines and deliver an average 16% increase in liquids production in a new waterflood Lift IQ service real-time surveillance helped maintain the efficiency of the Continuum ESP pumps in two wells of a mature field despite variations in production from more than 1,000 bbl/d to less than 100 bbl/d. 626.98 146.4 0 100 200 300 400 500 600 700 0 5 10 15 20 25 30 35 Fluid production, bbl/d Time, months Well 1, Continuum ESP Pump Run Life: 915 days 0 10 20 30 40 50 60 70 80 90 0 200 400 600 800 1,000 1,200 1,400 0 5 10 15 20 25 Frequency, Hz Fluid production, bbl/d Time, m