Production Life Cycle Management Service Averts Multiple Workovers and Saves USD 13 Million, Offshore Cameroon

Production Life Cycle Management Service Averts Multiple Workovers and Saves USD 13 Million, Offshore Cameroon

Pages 1 Pages

Case study: Artificial Lift Location: Cameroon Production Life Cycle Management Service Averts Multiple Workovers and Saves USD 13 Million, Offshore Cameroon 24 /7 /365 remote surveillance and control with emergency shutdown capability enable ESP and PCP optimization at distant wellsites In a mature oil field offshore Cameroon, there are several platforms where gas lift is the primary artificial lift method; however, increasing water cut prompted installation of ESPs and PCPs. By implementing the Lift IQ* production life cycle management service, the operator averted 13 pump failures over 4 years, saving USD 13 million in workover costs. Operator’s concerns After installing ESP and PCP equipment, flowline issues, power shortages, and hardware malfunctions at the remote wellsites ca