Case Study

Permian Operator Saves USD 700,000 on ESP Interventions

Permian Operator Saves USD 700,000 on ESP Interventions

Pages 1 Pages

slb.com/liftiq *Mark of Schlumberger Other company, product, and service names are the properties of their respective owners. Copyright © 2020 Schlumberger. All rights reserved. 19-AL-512952 Case study: Artificial Lift Location: Permian Basin Permian Operator Saves USD 700,000 on ESP Interventions Lift IQ service minimizes manual ESP restarts, saving time and eliminating deferred production Lift IQ service significantly reduced downtime and intervention time for 13 Permian Basin wells. After struggling with ESP downtime in unconventional Permian Basin wells, an independent operator used the remote operation capability of Lift IQ* production life cycle management service to slash deferred production and intervention costs. The operator’s concerns ¦ Well downtime because of ESP gas lo

Join for free to read