Case Study

Permian Basin Operator Improves ESP Productive Time by 94% in Depleted, Slugging Well—Without a Workover

Permian Basin Operator Improves ESP Productive Time by 94% in Depleted, Slugging Well—Without a Workover

Pages 1 Pages

Case study: Artificial Lift Location: Permian Basin, Texas Permian Basin Operator Improves ESP Productive Time by 94% in Depleted, Slugging Well—Without a Workover PCL and Lift IQ services help operator manage multiphase flow with expert analysis and remote, real-time changes to variable speed drive settings PCL and Lift IQ services delivered the expert analysis and remote, real-time adjustments the operator needed to improve ESP uptime to 62% from 32% before it stabilized at 56%. 60 Uptime, % 40 Time A Permian Basin operator managed unstable multiphase flow from a depleted unconventional well—without a workover that would have challenged project economics. Boost production from a depleted well After more than 600 days in an increasingly gassy and depleted Permian Basin well, a REDA*

Join for free to read