Case Study
SELBY CHP STOR
CASE STUDY SELBY CHP STOR HEADLINES KEY FACTS 20 MEGAWATT 80% EIGHT 10 TONNES combined heat and power on-site energy generation STOR of the site’s pipework fabricated off-site 18” stainless steel flue pieces among the large- scale fabrications made and delivered Project title: Selby CHP STOR Location: Selby, North Yorkshire Value: £580,000 Duration: 20 weeks G&H divisions : F abrication of steel and copper works made in our specialist facility CASE STUDY HOW WE DID IT We fabricated and installed all the components required for this industrial scale, purpose-built CHP on-site energy generation facility. We assembled a 16-strong team of engineers, welders, site supervisors and project managers to deliver the scheme that had been pre-designed by the c