CASE STUDY - NHS CLATTERBRIDGE CANCER CENTRE CHP HEADLINES KEY FACTS Project title: Clatterbridge Hospital Cancer Centre CHP scheme Location: Wirral Value: £480,000 Duration: 12 weeks (four weeks prefab, eight weeks installation onsite) G&H divisions : F abrication 4x of prefabricated stainless steel pipework of the scheme was fabricated offsite weeks to install and subterranean working in a live hospital environment long pipe bridge fabricated offsite 90% 8 2 MILES ROOFTOP 9 METRES CASE STUDY HOW WE DID IT Furthermore, it was a sensitive location given it is a cancer centre so great consideration was given to working in and around the site at all times. We managed the entire pipework installati