project case history DRAX POWER - SELBY Removal, supply, fabrication & installation of H.P and L.P. piping TEi Ltd won the contract to carry out HP & IP loop pipework replacement on Units 1, 2 and 3 turbines. Unit 2 in 2011. CMV HP (343mm o/dia x 57mm thk) and IP (511mm o/dia x 27mm thk) pipework replaced from the turbine Tee pieces to the steam chests. All design, procurement and site installation was included in the contract. All heat treatment