Case Study
RAPID BOIL™ was added to the system at Teviotdale Leisure Centre in stages.
CASE STUDY: TEVIOTDALE LEISURE CENTRE Report No: ETTEVIOT Approved by: B McMullen (CEng. MIChemE) Tom VanZeeland | Chief Technology Officer Raise Energy Solutions, LLC, 1059 Triad Court, Suite 1, Marietta, GA 30062 USA 678-331-5548 ext 104 | 919-349-8199 cell | tom@raiseenergysolutions.comRAPID BOILTM Case Study: TEVIOTDALE LEISURE CENTRE 1 CASE STUDY: TEVIOTDALE LEISURE CENTRE INTRODUCTION: RAPID BOILTM was added to the system at Teviotdale Leisure Centre in stages. 20 Litres were added in January 2013 and a further 80 litres were added throughout March/April 2013 giving a final RAPID BOILTM concentration of around 1200ppm. The product was added using a mechanical diaphragm metering pump. Teviotdale has a large leisure pool (approx 540,000 litres), which utilises the hea