Case Study

Railway Bridge Re-levelled And Re-supported

Railway Bridge Re-levelled And Re-supported

Pages 1 Pages

PROJECT PROFILE Summary All four piers supporting the rail bridge at Henty in Southern NSW had subsided so that for safety, train speed over the bridge had been limited to a maximum of 40kph. With Uretek structural resin injection to strengthen the foundation ground, the bridge piers were re-supported and raised back to their exact design levels. Objectives The objective was to re-level the rail lines and re- support the bridge piers quickly

Join for free to read