PROJECT PROFILE Summary Latent ground conditions on an iron ore mine site in Western Australia caused the footings of a 600 tonne ROM sidetipper bridge to subside up to 530mm over a 130m2 area. Side-tipper trucks haul loads from the Run of Mine (ROM) stocks and they dump their loads from an overhead bridge at the top of the ROM pad. This feeds the crusher located below. Our team successfully re-supported the bridge, consolidated the foundatio