Case Study
Pipeline Re-Supported And Re-Levelled
PROJECT PROFILE Summary This new sewerage pipeline was under construction and was damaged by the earthquakes of 2010-2011 prior to commissioning. The pipeline was raised back to its design levels over two weeks. Objectives The 1350mm diameter sewer pipeline suffered movement due to liquefaction of the saturated soils during the earthquake. The pipeline had suffered up to 60mm of settlement. Solution We re-confirmed support, provided void f