Case Study
Power Center Capacity Upgrades
Port of Seattle SeaTac, WA Harris Group provided all project management, electrical, mechanical, structural, and architectural design. We performed a thorough eld investigation of the entire low-voltage distribution system and modeled each area’s associated electrical distribution on system analysis software. Typical issues for power cutovers for a 24/7 public facility were increased due to the international ight arrivals and a large customs presence at the South Satellite Concourse B. Our design documents were prepared with a high level of detail that included construction phasing drawings and construction sequencing, and involved coordination with the Port’s PMG, maintenance, operations, F&I, PCS, and re department. The new and signi cantly larger (both physically and in terms of load