Case Study

T1 Winder Safety Upgrades

T1 Winder Safety Upgrades

Pages 2 Pages

GP Toledo Toledo, OR GP Toledo wanted to implement several safety improvements on their T1 winder. This winder is of a design, vintage and technology that have inherently higher operating hazards than the other Toledo mill winders. GP Toledo wanted to implement several safety improvements on the T1 winder as a result of a hazard identication and risk assessment (HIRA) they had performed. The Challenge: The mill needed a design team that could successfully integrate new vendor equipment and systems, while minimizing impact to operations during construction. The mill did not have sucient resources to provide construction management during the construction phase. The Solution: Harris Group team was able to develop project phases that allowed for construction activities to be completed on