Pol-e-Charki 33 MW Power Plant Upgrade | Afghanistan

Pol-e-Charki 33 MW Power Plant Upgrade | Afghanistan

Pages 2 Pages

Pol-e-Charki 33 MW Power Plant Upgrade | Afghanistan Pol-e-Charki, near Kabul in Afghanistan, required critical power infrastructure to address its continuous, reliable prime power needs. Challenge After the existing power plant fell into disrepair, the U.S. Army Corps of Engineers contracted Louis Berger to retro?t the power plant with new generators and expanded fuel storage, and then train a local team of Afghans to operate and maintain the power plant. Solution Louis Berger, with its joint venture partner, Cummins, delivered a custom, engineered solution to upgrade the power plant. This solution included: Upgrading the 33 MW power plant by replacing 14 existing generators. Adding an additional 200,000 gallons of fuel storage capacity. Recon?guring the existing medium voltage distributi