56 MW Power Plant at Bagram Air?eld | Afghanistan

56 MW Power Plant at Bagram Air?eld | Afghanistan

Pages 2 Pages

56 MW Power Plant at Bagram Air?eld | Afghanistan Once the largest and busiest American military base in Afghanistan, Bagram Air?eld housed 40,000 military personnel and civilian contractors at its peak. Challenge To address growing power demands of the base, the U.S. Forces Afghanistan and the U.S. Army Corps of Engineers, Philadelphia District, selected Louis Berger to operate and maintain Bagram’s base-wide power generation, electrical distribution and lighting infrastructure. Solution Louis Berger assumed operations and maintenance of an existing 56 MW gas turbine power plant, its largest power plant project in Afghanistan to date. Louis Berger is also responsible for operations and maintenance of the base’s medium voltage overhead and underground distribution system — greater than 100