Fast-track 30 MW Power Plant at Bagram Air?eld | Afghanistan

Fast-track 30 MW Power Plant at Bagram Air?eld | Afghanistan

Pages 2 Pages

Fast-track 30 MW Power Plant at Bagram Air?eld | Afghanistan Located 25 miles north of Kabul and originally built in the 1950s, Bagram Air?eld is one of the largest military bases in Afghanistan, equivalent to a town of 40,000 people. Challenge To address severe power shortages, Bagram Air?eld was in immediate need of expanded power generation capacity. The U.S. Army Corps of Engineers required a cost-e?ective and fuel-e?cient solution to meet Bagram Air?eld’s power needs within only 55 days. Solution Louis Berger with its technology partner, Cummins, was commissioned by the U.S. Army Corps of Engineers to install a 30 MW power plant on a fast-track basis. Louis Berger completed installation, testing and commissioning of the power plant in 55 days — including mobilization of equipment to