Case Study

Oceaneering Completes Successful Wind Turbine Anode Installation

Oceaneering Completes Successful Wind Turbine Anode Installation

Pages 2 Pages

Connecting What’s Needed with What’s Next TM oceaneering.com Case Study Project Overview Oceaneering was contracted by a leading geotechnical and offshore solutions provider to install anti-corrosion plate anode clamps on offshore wind turbine bases subsea. The job was performed by a work class Oceaneering ® Magnum ® Plus ROV fitted with a vendor- supplied torque tool, which mounted the clamps to the wind turbine bases, using a torque of 750 Nm. The anode installation was completed in May 2017 at an offshore wind farm located in an estuary. Water depths on the job varied from 52 ft to 98 ft (16 m to 30 m). Oceaneering Completes Successful Wind Turbine Anode Installation ROV-based renewable energy project supportoceaneering.com © 2018 Oceaneering International, Inc. All rights

Join for free to read