Oceaneering Completes Installation of Pipeline Repair Clamps

Oceaneering Completes Installation of Pipeline Repair Clamps

Pages 4 Pages

Connecting What’s Needed with What’s Next TM oceaneering.com Case Study Project Overview In late 2017, Oceaneering assisted in a pipeline repair campaign off the coast of Singapore. The project, completed at 20- 25 m water depths, covered the customer’s requirement for the installation of two external 48 in pipeline clamps for temporary mitigation against internal corrosion. The project scope included offshore and onshore project management, engineering and design, tooling, and personnel. The customer had a tight window for mobilization, which was already based on preset schedules and weather windows. The equipment required to perform the work was not off-the-shelf and had to be custom- designed and manufactured to meet their specific needs. Oceaneering Completes Installatio