Case Study

Oceaneering Route Preparation System Clears the Way for Cables at Scotland's Largest Offshore Wind Farm

Oceaneering Route Preparation System Clears the Way for Cables at Scotland's Largest Offshore Wind Farm

Pages 2 Pages

Connecting What’s Needed with What’s Next TM oceaneering.com Case Study Project Overview A wind farm located off the Moray coast of Northeast Scotland became Scotland’s largest offshore wind farm upon its completion in 2019. The wind farm consists of 84 wind turbines and provides power to approximately 450,000 homes. An Oceaneering team operated its 49.2-ft- wide (15m-wide) Route Preparation System throughout the wind farm array, future clearing lay and trench corridors between turbine locations. The Oceaneering Route Preparation System is a well-established, highly efficient, and economical method of clearing and preparing the seabed as the first stage of major wind farm construction projects. Issues Previously acquired survey data had identified significant boulder fields

Join for free to read